Installing the System
To prepare the installation site
CAU TI O N
Follow these steps to prepare the site for system installation.
To prepare the installation site
Step
1 Ensure that your installation site meets the
environmental requirements.
2 Ensure that your installation site meets the
electrical requirements.
Table 16 Environmental Requirements
Environmental Parameter
Temperature
Relative humidity
Altitude
Clearance (behind and above rack)
* Install air conditioning and heating as needed to achieve the required ambient temperature range
† Accuracy-enhanced measurement performance is specified at an ambient temperature range of
+25 C ±5 C. After calibration, hold the ambient temperature of the measurement environment to
±1 C of the ambient temperature at the time of calibration.
‡ Required to ensure the extractor fans can properly ventilate the system.
Table 17 Electrical Requirements
Electrical Parameter
Supply capability
Circuit sharing
64
This product is designed for indoor use in Installation Category II
and Pollution Degree 2 per IEC 61010-1 and 664 respectively.
‡
Notes
•
Environmental requirements (temperature,
relative humidity, altitude, and clearance) are
listed in
Table
16.
•
Electrical requirements are listed in
System Requirement
+0 C to +45 C (+32 F to +113 F)
Maximum 80% for temperatures up to 31 C
decreasing linearly to 50% at 40 C
Up to 3000 meters (approximately 10000 feet)
15 centimeters (6 inches) minimum
System Requirement
100/120 volts, 2000 VA
200/240 volts, 2000 VA
Do not connect air conditioning or
motor-operated equipment to the same ac
circuit supplying line voltage to the system.
Installation and User's Guide
Table
17.
*†
.