To Verify The Shipment - Agilent Technologies 85225F Installation And User Manual

Performance modeling system
Table of Contents

Advertisement

2
Installing the System

To verify the shipment

Use
• confirm the completeness of the shipment
• provide component part and model numbers required to order
All replacement items are available from Agilent Technologies. Part
numbers for replacement instrument subassemblies are listed in their
individual service manuals.
The majority of the system components are shipped preconfigured in the
system rack cabinet.
The PGUs (pulse generator units) and GNDU (active ground unit) are
factory- installed in the 41501B PGU expander.
With the exception of the bias networks, semi- rigid and SMU triaxial
cables, all other cables are connected at the factory.
Other cables and accessories are shipped inside the rack-mounted storage drawer.
NO TE

To verify the shipment

Step
1 Verify that the serial
numbers on the rear panel
of the system instruments
match the serial numbers
listed in the shipping
documentation.
68
Table 18
"System Receiving Checklist and Replaceable Parts" to:
replacement parts
Action
Compare the serial numbers listed in the
shipping documents with the serial numbers
on the instrument's rear panel serial number
labels.
If an instrument serial number does not
match the shipping document, report
mismatched serial number to your
Agilent Technologies sales
representative.
If all instrument serial numbers match
the shipping documents, continue to
step
2.
Notes
For a list of support contacts, see
receive additional assistance"
page 107.
Installation and User's Guide
"To
on

Advertisement

Table of Contents
loading

Table of Contents

Save PDF