Performing The Cv Subsystem Functional Verification Test - Agilent Technologies 85225F Installation And User Manual

Performance modeling system
Table of Contents

Advertisement

Performing the CV Subsystem Functional Verification Test

If the performance of the Agilent 4284A precision LCR meter is in
question, complete the following steps to verify operation.
To perform the RF subsystem functional verification test
Step
1 Activate the precision LCR
meter.
2 Warm-up the network
analyzer for 1 hour.
3 Run the required self
tests.
Installation and User's Guide
Action
a Connect the precision LCR meter to
line power.
b Switch on the line power.
a Wait 1 hour before continuing to
step 3.
a On the precision LCR meter front
panel, press CATALOG/SYSTEM >
SELF TEST.
b Enter the number corresponding to
the required self test and press
SELF TEST.
CV Subsystem Functional Verification Test
Notes
This opens the SELF TEST page.
For more information, see chapter 5
"Catalog/System Configuration" in the
Agilent 4284A precision LCR meter operation
manual.
D
131

Advertisement

Table of Contents
loading

Table of Contents

Save PDF