Installation; Delivery, Transportation, Positioning And Storage; Receipt Of The Ups And Visual Inspection; Unpacking List - ABB PowerValue RT G2 User Manual

Ups 5-10 kva ul
Table of Contents

Advertisement

12
A B B U P S P R O D U C T S A N D S O L U T I O N S

4 Installation

4 .1 Delivery, transportation, positioning and storage

4 .1 .1 Receipt of the UPS and visual inspection

When receiving the UPS, carefully examine the
packing container and the UPS for any signs of
physical damage.
WARNING
The packing container of the UPS protects it
from mechanical and environmental damage. To
increase protection, the UPS is wrapped in a
plastic sheet. Keep the packaging for later re-use.

4 .1 .2 Unpacking list

After examining the package, open the box
and check the following items are included:
• 1 x PowerValue RT G2 UPS
• 1 X USB flash drive
• 1 x USB Communicate cable
• 1 x RS232 Communicate cable
• 1 x RJ45 Parallel Cable
• 2 x AC Cable gland(5-6K)
3 x AC Cable gland(8-10K)
• 2 x Parallel Cable gland
• 2 x Parallel Cable bushing
• 4 x Standfoot
• 4 x Standfoot extension
• 2 x Mounting ear
• 32 x Screw/nut
• 1 x Slide(Left and Right)
IN CASE OF RECOGNIZABLE DAMAGE: DO
NOT CONNECT ANY VOLTAGE TO THE UNIT
/DO NOT PUT THE UNIT INTO OPER ATION
Examine the UPS for any signs of damage and
ensure that the received UPS corresponds to the
material indicated in the delivery note. Notify
your carrier or supplier immediately in case of any
damage.

4 .1 .3 Operation of EBM

The UPS system contains no user-serviceable
parts. If the battery service life (3~5 years at 25°C
ambient temperature) has been exceeded, the
batteries must be replaced. In this case, please
contact your dealer.
Be sure to deliver the spent battery to a
recycling facility or ship it to your dealer in the
replacement battery packing material.

4 .1 .4 Storage of UPS

Before storing, charge the UPS 5 hours. Store the
UPS covered and upright in a cool, dry location.
During storage, recharge the battery in
accordance with the following table:
Storage temperature Recharge frequency Charging duration
-25°C - 40°C
Every 3 months
40°C - 45°C
Every 2 months
1-2 hours
1-2 hours

Advertisement

Table of Contents
loading

Table of Contents