Cisco ASR 1000 Series Installation And Configuration Manual page 155

Cisco systems routers installation and configuration guide
Table of Contents

Advertisement

Chapter 5
Cisco ASR 1004 Router Overview and Installation
Step 3
On the DC power supply terminal block, locate the GND connection which must be connected first and
follow these steps:
a.
Using the two-hole grounding lug, replace the washers and Kepnut screw in the following order.
Tighten the Kepnut screws (use the screwdriver to tighten the screw in the terminal block to a torque
b.
of 8 in-lbs / 2 per.) on the power supply studs.
Figure 5-19
Attach the other end of the cable to the site ground connection.
Step 4
Before you continue to install the terminal block wires, stop and perform Step 5. To prevent any contact
Caution
with metal lead on the wire and the plastic cover.
You must wrap the positive and negative cables with sleeving. Take each wire and cover the area from
Step 5
the lug to the wire with heavy shrink sleeving.
OL-13208-03
Flat washer
Grounding cable lug
Kepnut screw
Cisco ASR 1004 Router DC Power Supply Grounding Wire and Stud
End View
Ø 0.267
0.48
2 holes
0.08
Cisco ASR 1000 Series Aggregation Services Routers Hardware Installation and Initial Configuration Guide
2.24
Crimp area
0.25
0.63
0.37
Connecting Power to Cisco ASR 1004 Router
All measurements in inches
5-27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents