Yamato INE800 Manual page 10

Eco incubator
Table of Contents

Advertisement

6.Power supply
●Use a power supply that meets the electrical capacity of the unit.
Electrical capacity::AC100V
Avoid connecting too many devices using a branching outlet or extending a wire with a cord reel or
refrigerating function and temperature controlling function may degrade due to voltage drop and heat
generation or a fire may occur.
7. Handling of a power cord
● Never use electrical power cords bundled. When these are used bundled, they might
overheat causing a fire.
● Do not convert, forcibly bend, twist or pull the power cord. Otherwise, a fire or an electrical
shock may result.
● Do not place the power cord under a desk or a chair, or sand between objects to avoid it from
being damaged. Otherwise, a fire or an electrical shock may result.
● Do not place the power cord close to a stove or other heat-generating device. Sheath of the
cord may burn and result in a fire or an electrical shock.
● If the power cord should be damaged (exposure of core wire or disconnection), immediately
turn the ELB off, turn the power supply off and ask your dealer to replace the cord. If the unit
is operated with a damaged power cord, a fire or an electrical shock may result.
● Connect the power cord to an appropriate wall outlet.
8. Installation
● The unit might fall down or move by an earthquake or an impact resulting a personal injury.
We recommend making safety measures such as to avoid installing the unit at a place other
than busy places.
9.About fixing the adjusters
There are adjusters at two positions on the
front of the main unit.
When
the
determoined, follow the procedures below to
fix the adjusters.
① Turn the adjusters until they securely sit
on the floor.
② Check for gaps at four points on the
installation points on the main body.
③ Turn the nuts to securely fix the adjusters
under the bottom surface to prevent
loosening.
10.After installation
● The unit may topple down in an earthquake or an unexpected impact and cause personal
injuries. Take appropriate topple-down preventive measures for safety.
10A (ELB capacity:15A)
installation
site
has
2. Before operating the unit
How to install and preparation before operation
been
6

Advertisement

Table of Contents
loading

Table of Contents