ASCOM NU Series Installation Manual page 53

Table of Contents

Advertisement

Installation Manual
NU-Series Hardware
To mount the display from a ceiling:
1. Ensure that the LAN cable is connected to the corridor display. See
the LAN Cable" on page
2. Drill two screw holes in the ceiling 235mm (9.25in.) apart for the type of eyelet screws
(not included) that will be used to support the display device.
3. Mount the two eyelet screws. Use anchors to secure the screws, if necessary.
Legend:
(1) Ceiling anchor
(2) eye bolt
(3) 235mm (9.25in.)
4. On the corridor display fixtures, slightly unscrew the two hex screws at the top. On one
end pull the nylon line suspension through the hole of the display fixture and tighten
the hex screw using a hex key.
5. Pull the suspension nylon line through the two eyelet fixtures in the ceiling and fix the
line at the other end of the display.
6. Connect the Ethernet cable from the corridor display to the outlet. See
"5.4.5, Connecting the LAN Cable" on page
P/N PM000223A • Rev. 1 • ISS 9 August 2017
IP Devices
43.
43.
"5.4.5, Connecting
45

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the NU Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

NupbcNudl4sNucl4pNudl2s

Table of Contents

Save PDF