Piper ARCHER III Pilot Operating Handbook page 25

Hide thumbs Also See for ARCHER III:
Table of Contents

Advertisement

PA-28-181, ARCHER ID
1.21 GlOOO GNSS (GPS/SBAS) NAVIGATION SYSTEM EQUIPMENT
APPROVALS (continued)
Navigation
Specification
RNAV I
ISSUED: December 22, 2017
REVISED: July 15, 2020
Operational
Reference
Requirements/
Documents
Authorizations
Must have GNSS/
FAA AC
SSAS capability
20-1380.
and avai !ability or
GNSS RAIM/FDE
FAA AC
availability must
90-IOOA
be verified prior to
CHG2.
flight. Maximum
predicted RAIM/ FOE
unavailability is 5
minutes. 1
The GNSS RNA V
system is installed
and meets the
performance and
functional
requirements of AC
90-lOOA CHG 2.
In accordance with
AC 90-I00A, CHG 2.
Part 91 operators
(except subpart K)
following the aircraft
and training guidance
in AC 90-lOOA CHG
2 are authorized to fly
RNA V I procedures.
Part 91 subpart K,
121,125, 129,and
135 operators require
operational approval
.
!CAO Flight
Plan Code
Item I0a
Item 18
Code
PBN/
R
02
Includes RN AV terminal
departure and arrival
procedures.
REPORT: VB-2749
SECTION 1
GENERAL
Notes
1-Sc

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pa-28-181

Table of Contents