Piper ARCHER III Pilot Operating Handbook page 26

Hide thumbs Also See for ARCHER III:
Table of Contents

Advertisement

SECTION 1
GENERAL
1.21 GIOOO GNSS (GPS/SBAS) NAVIGATION SYSTEM EQUIPMENT
APPROVALS (continued)
Operational
Navigation
Requirements/
Specification
Authorizations
P-RNAY
GNSS receiver is
(Europe)
required for takeoff in
P-RNA V airspace.
Musi have GNSS/
SBAS capability
and availability or
GNSS RAIM/FDE
availability must be
verified prior 10 flight.
This does not
constitute an
operational approval.
RNP I
Procedures containing
Radius-to-Fix (RF)
legs are no1
authorized.
Must have GNSS/
SBAS capability
and availability or
GNSS RAIM/FDE
availability must
be verified prior 10
flight. Maximum
predicted RAI M/ FOE
unavailabiliry is 5
minutes. 1
In accordance with
AC 90-1 0SA, Part 91
operators ( except
subpart K), following
the aircraf1 and
training guidance in
AC 90-105A are
authorized to fly
RNP I procedures.
REPORT: VB-2749
1-Sd
!CAO Flight
Reference
Plan Code
Documents
Item IOa
Item 18
Code
FAA AC
R
20-1380.
FAA AC
90-96A
CHG I.
JAA TGLI0
Rev I.
FAA AC
R
20-1380.
FAA AC
90-I0SA.
ISSUED: December 22, 2017
PA-28-181, ARCHER ill
Notes
PBN/
!CAO night plan code
02
for P-RNA V no longer
exists.
P-RNA V urili7. e . � RNAV
I flight plan codes.
02
I ncludes RNP terminal
departure and arrival
procedures.
REVISED: July 15, 2020

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pa-28-181

Table of Contents