Piper ARCHER III Pilot Operating Handbook page 27

Hide thumbs Also See for ARCHER III:
Table of Contents

Advertisement

PA-28-181, ARCHER Ill
1.21 GlOOO GNSS (GPS/SBAS) NAVIGATION SYSTEM EQUIPMENT
APPROVALS (continued)
Navigation
S peci ficati on
RNP I
(continued)
RNPAPCH
LNAV
minima
ISSUED: December 22, 2017
REVISED: July 15, 2020
Reference
Operational
Documents
Requirements/
Authorizations
Pa. rt 91 subpart K.
( continued)
121,125,129, and
135 operators require
operational approval.
FAA AC
Procedures containing
R adius-to-Fix (RF)
20-138D.
legs are not
authorized.
FAA AC
90-105A.
Must have GNSS/
SBAS capability
EASAAMC
and availability or
20-27A.
GNSS RAIM/FDE
availability must
be verified prior to
flight. Maximum
predicted RAIM/ FOE
unavailability is 5
minutes. 1
ALI instrument
approach procedures
that are retrieved from
the current
navigation database
are authorired.
In accordance with
AC90-105A. Part91
operators ( except
subpart K), following
the aircraft and
training guidance in
AC 90-105A are
authorized to fly RNP
APCH LNA V minima
procedures
Pan 91 subpart K.
121,125.129, and
135 operators require
operational approval.
ICAO Flight
Plan Code
Item I0a
Item 18
Code
PBN/
(cont.)
(continued)
(cont.)
R
Includes non-precision
SI
approaches based on
conventional navigation
aids with "or G PS''
in lhe Litle and area
navigation approaches
titled "GPS",
"RNA V (OPS)", and
"RNA V (GNSS)".
REPORT: VB-2749
SECTION 1
GENERAL
Notes
1-Se

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pa-28-181

Table of Contents