Piper ARCHER III Pilot Operating Handbook page 30

Hide thumbs Also See for ARCHER III:
Table of Contents

Advertisement

SECTION 1
GENERAL
1.21 GlOO0 GNSS (GPS/SBAS) NAVIGATION SYSTEM EQUIPMENT
APPROVALS (continued)
Navigation
Operational
Specification
Requirements/
Authorizations
RNP APCH
Procedures containing
LPV minima
Radius-to-Fix (RF)
Legs are nOL
authorized.
AU instrument
approach procedures
that are retrieved from
the current
navigation database
are authorized.
In accordance with
AC90-107, Pan91
operators (except
subpan K), following
the ai re raft and
Lrain in g guidance in
AC 90-107 are
authorized to fly RNP
APCH LPV minima
procedures.
Part 9 I subpart K,
121, 125, 129, and
135 operators require
operational approval.
RNPAR
APCH
REPORT: VB-2749
1-Sh
Reference
ICAO Flight
Documents
Plan Code
Item IOa
Item
Code
FAA AC
B
20-138D.
FAA AC
90-107.
EASA
AMC20-28.
ISSUED: December 22, 2017
PA-28-181, ARCHER III
Notes
18
PBN/
N/A
Includes area navigation
approaches titled
"RNA V (GPS)" and
"RNA V (GNSS)."
GNSS/SBAS capability
and availability is
required for LPV
procedures.
Nor Au1.horized.
REVISED: July 15, 2020

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pa-28-181

Table of Contents