Installation Guidelines; Connecting Hardware; Verifying Fieldbus Gateway Operation - Advantech EKI-1242 Series User Manual

Modbus rtu/tcp to bacnet ip/mstp | ethercat | ethernet/ip | profinet fieldbus gateway
Hide thumbs Also See for EKI-1242 Series:
Table of Contents

Advertisement

2.1

Installation Guidelines

The following guidelines are provided to optimize the device performance. Review
the guidelines before installing the device.
Make sure cabling is away from sources of electrical noise. Radios, power lines,
and fluorescent lighting fixtures can interference with the device performance.
Make sure the cabling is positioned away from equipment that can damage the
cables.
Operating environment is within the ranges listed range, see "Specifications" on
page 2.
Relative humidity around the fieldbus gateway does not exceed 95 percent
(noncondensing).
Altitude at the installation site is not higher than 10,000 feet.
In 10/100 and 10/100/1000 fixed port devices, the cable length from the fieldbus
gateway to connected devices cannot exceed 100 meters (328 feet).
Make sure airflow around the fieldbus gateway and respective vents are
unrestricted. Without proper airflow, the fieldbus gateway can overheat. To
prevent performance degradation and damage to the fieldbus gateway, make
sure there is clearance at the top and bottom and around the exhaust vents.
2.1.1

Connecting Hardware

In this instruction, it will explain how to find a proper location for your Fieldbus
Gateways, and how to connect to the network, hock up the power cable, and connect
to the EKI-1242 Series.
2.2

Verifying Fieldbus Gateway Operation

Before installing the device in a rack or on a wall, power on the fieldbus gateway to
verify that the fieldbus gateway passes the power-on self-test (POST). To connect
the cabling to the power source see "Power Supply Installation" on page 23.
At startup (POST), the System LED blinks green, while the remaining LEDs are a
solidy green. Once the fieldbus gateway passes POST self-test, the System LED
turns green. The other LEDs turn off and return to their operating status. If the
fieldbus gateway fails POST, the System LED fieldbus gateways to an amber state.
After a successful self-test, power down the fieldbus gateway and disconnect the
power cabling.
The fieldbus gateway is now ready for installation on its final location.
15
EKI-1242 Series User Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eki-1242ieims-aEki-1242iecms-a

Table of Contents