Download Print this page

Powering And Testing Procedures - Brivo ACS6008 Installation Manual

Advertisement

POWERING AND TESTING PROCEDURES

Power up the control panel.
1. Plug the transformer into a 120VAC outlet.
2. Check ALL power indicators:
a) Once the chassis door is closed, check the power supply board through the clear viewing
hole to confirm that the green LED is on, indicating that AC power is being supplied to
board and that the board is producing 12VDC power.
b) Check the MAIN BOARD to confirm that the LOCAL HRTBT (local heartbeat) and MAIN
HRTBT (main heartbeat) have come on and are blinking.
© 2019 Brivo Systems LLC. All rights reserved.
WARNING: Power Precautions
BEFORE POWERING UP THE CONTROL PANEL, CHECK THE FOLLOWING
CONNECTIONS. MAKE SURE THAT:
The transformer is NOT plugged into the 120VAC outlet.
All wiring to the back-up battery is DISCONNECTED.
NOTE: Firmware Upgrade at First Time Connect
When first registered and connected to the Brivo Onair cloud service, your ACS300
will automatically download and install the latest firmware. This process may take
several minutes, so do not disconnect or cut power to your ACS300 during this
process. If you encounter any difficulties, please contact Brivo Technical Support at
866-274-8648
or email customercare@brivo.com.
The local heartbeat should begin blinking immediately.
The main heartbeat can take 30-60 seconds to establish a steady beat.
Figure 26 - MAIN BOARD Heartbeats
Brivo ACS6000 Installation Manual
P-MAN-PUB-ACS6000 Installation Manual
38

Advertisement

loading

This manual is also suitable for:

Acs6000Acs6000-02