Preparing Tools And Instruments; Mounting The Battery Pack And Inverter - Alpha ESS SMILE-T10-HV Installation Manual

Energy storage system
Table of Contents

Advertisement

MOUNTING

6.2 Preparing Tools and Instruments

Category
Tools and Instruments
Hammer drill (with a
Ф10 mm drill bit)
Diagonal pliers
Rubber mallet
Installation
Crimping tool
(model:
PV-CZM-22100)
Vacuum cleaner
Marker
Personal
Safety gloves
protective
equipment
Safety shoes
Multimeter (DC voltage
Torque socket
measurement range ≥
wrench SW10
1000 V DC)
Torque screwdriver
(slotted head,
Wire stripper
torque range: 0–5 N m)
Utility knife
Cable cutter
Disassembly and
Assembly Tool (model:
Cord end terminal
PV-MS-HZ open-end wrench)
crimper
Heat shrink tubing
Heat gun
Measuring tape
Bubble or digital level
Anti-dust respirator
Safety goggles
N/A
N/A
20
21

6.3 Mounting the Battery Pack and Inverter

6.3.1 Mounting the battery pack
1.
Lift the battery pack by using the handles at the two sides, take it out from
the package carton. Do not put the battery pack upside down on the ground.
2.
Place the battery positioning paper plate against the wall and the bottom against
the floor, and mark the positions of the two drill holes.
3.
Drill 2 holes on the wall with a diameter of 10mm and a depth of about 70mm.
MOUNTING

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents