Routine Maintenance; Tool And Consumable Requirements List; Tools And Equipment Requirements; Consumables List - Alpha ESS STORION-T50 Operation & Maintenance Manual

Hide thumbs Also See for STORION-T50:
Table of Contents

Advertisement

ROUTINE MAINTENANCE

09
Routine maintenance

9.1 Tool and Consumable Requirements List

9.1.1. Tools and equipment requirements

No.
Name
1
Slotted screwdriver
2
Phillips screwdriver
3
Wrench
4
Multimeter
5
Clamp Meter
6
Insulation tester
7
Ethernet cable
8
USB-485 data cable
9
Digital storage oscilloscope
10
Power quality analyzer

9.1.2. Consumables list

Model specification
No.
Name
(precision)
1
Electrical tape
2
Plastic cable ties

9.2 Maintenance list

A.
Check whether the cable connection is loose;
B.
Check whether the cable is aging or damaged;
C.
Check whether the cable insulation tape is dropped;
D. Check whether the cable terminal screws are loose and whether there are
signs of overheating;
E.
Check whether the grounding is normal;
Model
specification
Quantity
Unit
(precision)
2、4、6、8"
......
1
2、4、6、8"
......
1
......
1
......
1
......
1
......
1
......
CAT5E
1
......
/
1
......
(If any)
1
......
(If any)
1
Unit
Quantity
......
......
Several disks
Several
28
29

9.2.1. Routine inspection

9.2.1.1 Power on inspection
Operators need to conduct daily inspections of the equipment, and maintain the
equipment by observing the status of the equipment indicator lights and software
monitoring information.
Check items
Remarks
1.Battery
Indicator light
EMS display
Battery cluster
flags
Remarks
......
LMU sampling
line
System running
2.PCS
PCS display
Inspection
Check content
requirements
Check all battery and
highvoltage control box
Flashing green light
indicators when the
system is runnin
normally
There is nothing wrong
The fault light goes
with the EMS display
out and the interface
when the system is
displays On-Grid
operating normally
Mode
Check whether all
battery cluster flags on
Interface entry: Status
the BMS display of
Battery Relay to view
each container are
normal
Use the host computer
to monitor the voltage,
temperature and event
conditions of the
module, and check
The data is normal,
whether the sampling
there is no looseness
line connection terminal
or damage
and terminal block of the
LMU, and the
communication line
connection terminal
block are loose or
damaged
Check if there is any
No abnormal noise
abnormal noise
when the system is
running
All voltage, power
and current data on
Check the PCS screen
the PCS should be
normal
ROUTINE MAINTENANCE
Time
Notes
Once 6
months
Once 6
months
Once 6
months
Once 6
months
Once 6
months
Once 6
months

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storion-t100

Table of Contents