Chapter 3 Installation Preparation - Raven Hawkeye 2 Installation Manual

Hide thumbs Also See for Hawkeye 2:
Table of Contents

Advertisement

CHAPTER
3
Perform the following procedure to prepare the implement for installation of the Hawkeye® 2 nozzle control
system.
1. Rinse and fill the tank with clean water.
2. Move the equipment to an open area suitable for testing application system operation and rinsing the boom
plumbing.
3. Unfold the boom and enable the application control system. Verify that all control hardware (e.g. control valves,
section valves, etc.) and spray tips function as expected.
4. Operate the system until any chemicals are rinsed from the boom supply lines.
5. Disable the application control system and de-pressurize the boom.
6. Replace existing carrier line strainer(s) with an 80 mesh strainer. An 80 mesh or finer strainer is required for use
with the Hawkeye® 2 nozzle control system.
7. If turret style nozzle bodies are installed on the implement, rotate the turret to an open spray position, if
available. If an open spray position is not available, or for nozzle bodies without a turret, remove the spray tips
from the boom and set aside for later use.
8. Enable the application control system and run clean water for at least 20 seconds to rinse any remaining debris
from the boom plumbing and nozzle bodies.
9. Remove the cap and diaphragm from the nozzle bodies.
Installation Preparation:
I NSTALLATION PREPARATION
C H A P T E R 3
CAUTION
Chemical residues may be present. Thoroughly
bleed pressure from chemical lines and rinse the
system with clean water prior to installing or
servicing fittings, hoses, valves, or nozzles in the
application system.
11