Raven Hawkeye 2 Installation Manual page 19

Hide thumbs Also See for Hawkeye 2:
Table of Contents

Advertisement

NOTE:
Keep the boom connections clean and off the ground while routing.
Do not secure cables with cable ties until all cables are in place and routings are checked for pinch
points and other interferences.
Ensure sufficient slack is available at fold and break-away joints to allow for full range of motion
without stretching the cable.
4. Next, repeat step 1 through 3 for the inner boom cable for the opposite side.
5. Continue routing both mid and outer boom cables while aligning the 8-pin connector drops with the
Hawkeye® 2 NCVs.
6. The Hawkeye® 2 boom cables may need to be routed over the mid fold joints and boom break-away joints as
applicable.
FIGURE 3. Boom Cable Routing - Over Mid Fold Joint
NOTE:
The connector with the rotating locking collar will always go towards the center of the machine.
7. If not already applied, apply a single, short burst of corrosion inhibitor to each electrical connection before
mating the connection. Corrosion X HD (P/N 222-0000-020 or available from http://www.corrosionx.com/
corrosionx-heavy-duty.html) is recommended.
8. Be sure the corrosion inhibitor has coated the electrical contacts and recessed portions of the connector.
NOTE:
To determine if corrosion inhibitor has been applied, inspect for a thick liquid in the bottom of the
connector.
9. Once all boom cables are routed along the boom as desired, begin connecting the boom cables to the
Hawkeye® 2 NCVs previously installed.
Hawkeye® 2 NCV and Boom Cable Installation: Boom Cable Routing and Connection
HAWKEYE® 2 NCV AND BOOM CABLE INSTALLATION
15

Advertisement

Table of Contents
loading

Table of Contents