CHAPTER
3
INSTALLATION PREPARATION
Verify Software version 2.1.5.32 or higher is present on the Raven Viper 4, or that Version 30 or higher is
present on the Case IH Pro 700 controller if equipped.
SYSTEM CLEANOUT
Remove all pressure from plumbing components. Drain out the main carrier tank, rinse tank, and boom plumbing.
TANK AND PLUMBING PREPARATION
NOTE:
If the machine has preexisting component mounting provisions show below, proceed to the bracket
installation section.
FIGURE 1. Component Mounting Provisions
Located on
Main Frame
Towers
1. Move the machine to a safe area with enough space to unfold the main boom.
2. Unfold the boom and lower center section to allow access to the main frame towers cross tubes. Support the
center section of the machine (if necessary).
3. Disconnect the machine battery and the cables from the field computer or controller in the cab.
NOTE:
Failure to disconnect electrical before welding on the machine can damage electrical components.
Installation: Installation Preparation
I NSTALLATION
C H A P T E R 3
Rear Axle
Frame
Support
Preexisting
Hole Pattern
11