Page 1
Hawkeye® 2 Installation Manual for ET Apache Sprayers MY 2017+ 016-0171-716 Rev. A 6/2021 E37234 Copyright 2021...
Page 2
Raven systems, or products used as components of systems, which rely upon the reception of these signals or availability of these services. Raven Industries accepts no responsibility for the use of any of these signals or services for other than the stated purpose.
RCM - Sprayer Installation ............................ 32 Install the RCM - Sprayer ..............................32 Mount the RCM - Sprayer with Raven Autoboom XRT ..................33 Install the RCM - Sprayer Cables and System Power Cables ..............34 ET Apache ECU Connections (MY 2017 & 2018) .....................35...
Page 4
Table of Contents Hawkeye® 2 Installation Manual for ET Apache Sprayers MY 2017+...
• Do not operate this Raven system or any agricultural equipment while under the influence of alcohol or an illegal substance. • Be alert and aware of surroundings and remain in the operator seat at all times when operating this Raven system.
• Do not connect the power leads to the battery until all system components are mounted and all electrical connections are completed. • Always start the machine before initializing this Raven system to prevent power surges or peak voltage. • To avoid tripping and entanglement hazards, route cables and harnesses away from walkways, steps, grab bars, and other areas used by the operator or service personnel when operating or servicing the equipment.
The word “harness” is used to describe any electrical cables and leads, both bundled and unbundled. Use the following guidelines and recommendations when connecting and routing harnesses while installing or maintaining this Raven system: • Leave protective caps/covers over harness connectors until needed to avoid dirt and moisture from contaminating electrical circuits.
Page 8
CHAPTER 1 Hawkeye® 2 Installation Manual for ET Apache Sprayers MY 2017+...
I NTRODUCTION CHAPTER C H A P T E R 2 MAKE AND MODEL COMPATIBILITY Hawkeye® 2 is a pressure-based product control system which allows for precise sprayer application over a range of conditions and reduced spray drift. Each nozzle is controlled by an individual pulsing valve giving you a consistent spray pattern as speed and conditions change.
Page 10
CHAPTER 2 Compatible Equipment Information TABLE 2. Nozzle Body Nozzle Boom Boom Make and Model Kit Number Type Spacing Type Width 60’/90’ 117-2005-132 Standard 90’ 117-2005-134 100’ 117-2005-136 15” 100’ 117-2005-138 Pommier 120’ 117-2005-140 132’ Wilger 60’/90’ 117-2005-133 Standard 90’ 117-2005-135 100’...
The following components must be installed with the Hawkeye® 2 nozzle control system: • Updated software on field computers or control monitors • PWM pump control valve • Raven compatible flow meter • Raven compatible pressure transducer • 80 (or finer) mesh strainer NOTE: Air induction style spray tips should not be used with the Hawkeye®...
INTRODUCTION UPDATES Raven software and documentation updates may be made available periodically on the Raven Applied Technology web site: portal.ravenprecision.com At Raven Industries, we strive to make your experience with our products as rewarding as possible. One way to improve this experience is to provide us with feedback on this manual.
Page 28
CHAPTER 2 Hawkeye® 2 Installation Manual for ET Apache Sprayers MY 2017+...
I NSTALLATION PREPARATION CHAPTER C H A P T E R 3 Perform the following procedure to prepare the implement for installation of the Hawkeye® 2 nozzle control system. CAUTION Chemical residues may be present. Thoroughly bleed pressure from chemical lines and rinse the system with clean water prior to installing or servicing fittings, hoses, valves, or nozzles in the application system.
Page 30
CHAPTER 3 Hawkeye® 2 Installation Manual for ET Apache Sprayers MY 2017+...
H AWKEYE® 2 NCV AND BOOM CHAPTER C H A P T E R 4 CABLE INSTALLATION HAWKEYE® 2 NOZZLE CONTROL VALVE INSTALLATION BEST PRACTICES AND RECOMMENDATIONS • Do not connect battery leads until all cables are installed and connected. •...
CHAPTER 4 3. Align the NCV2 with the port of the nozzle body while being careful not to lose the O-ring. NOTE: The NCV2 should always be located on the port closest to the wet boom tube unless interferences do not allow this.
Page 33
HAWKEYE® 2 NCV AND BOOM CABLE INSTALLATION FIGURE 2. Boom Cable Routing - Over Pivot - Pommier Boom NOTE: Keep the boom connections clean and off the ground while routing. Do not secure cables with cable ties until all cables are in place and routings are checked for pinch points and other interferences.
Page 34
CHAPTER 4 7. Be sure the corrosion inhibitor has coated the connector electrical contacts and recessed portions of the connector. NOTE: To determine if corrosion inhibitor has been applied, inspect for a thick liquid in the bottom of the connector. 8.
MOUNTING PLATE PREPARATION NOTE: If Raven Autoboom XRT is already installed on this machine, skip this section and refer to “Mount the RCM - Sprayer with Raven Autoboom XRT” on page 33. 1. Locate the electrical panel on top of the center rack on the back of the machine and above the section valves.
CHAPTER 5 RCM - SPRAYER INSTALLATION INSTALL THE RCM - SPRAYER 1. Locate the RCM - Sprayer (P/N 063-0173-956), M6 bolts (1x70MM and 2x80MM), nuts, and M6 washers provided with the Hawkeye® 2 kit. 2. Begin mounting the RCM - Sprayer by holding it up against the mounting plate on the right side and marking the top center hole location on the mounting plate.
RCM - SPRAYER MOUNTING AND CONNECTION MOUNT THE RCM - SPRAYER WITH RAVEN AUTOBOOM XRT This section is only meant to be referenced if the machine already has Raven Autoboom XRT installed. FIGURE 3. RCM - Sprayer Mounting with Raven Autoboom XRT 1.
CHAPTER 5 INSTALL THE RCM - SPRAYER CABLES AND SYSTEM POWER CABLES 1. Locate the RCM - Sprayer adapter cable (P/N 115-2005-095) provided in the kit. 2. Identify the two RCM - Sprayer connectors (one black, one gray) and connect these to the RCM - Sprayer. FIGURE 4.
RCM - SPRAYER MOUNTING AND CONNECTION ET APACHE ECU CONNECTIONS (MY 2017 & 2018) 1. Locate the Hawkeye ECU cable harness (P/N 115-7303-143) provided in the kit. 2. Locate the four 12-pin Deutsch connectors (one of each: gray, black, green, brown) grouped together, and connect them to the matching connectors of the RCM - Sprayer adapter cable (P/N 115-2005-095) previously installed.
Page 40
CHAPTER 5 5. Connect the three pin jack to the flowmeter. FIGURE 8. Flowmeter Connection Flowmeter Connection 6. Connect the 12 pin receptacle on the Hawkeye ECU harness (P/N 115-7303-143) to the 12 boom section valve plug on the machine harness. FIGURE 9.
Page 41
RCM - SPRAYER MOUNTING AND CONNECTION 7. Connect the ISO tank fill plug on the Hawkeye ECU harness (P/N 115-7303-143) to the tank fill receptacle on the machine cable harness (if applicable). FIGURE 10. ISO Tank Fill ISO Tank Fill 8.
CHAPTER 5 SYSTEM POWER CONNECTION (MY 2017 & 2018) 1. Locate the RCM - Sprayer power cable (P/N 115-2005-008) provided in the kit. FIGURE 12. Harness Under Electrical Box Electrical Box Receptacle on Harness 2. Locate the large, round connector of the breakaway cable (P/N 115-2005-001) and connect it to the corresponding connector of the power cable.
RCM - SPRAYER MOUNTING AND CONNECTION SYSTEM POWER CONNECTION (MY 2019 & 2020) 1. Locate the black 8-pin connector on the RCM - Sprayer breakout cable (P/N 115-2005-091). 2. Locate the black receptacle on the power module box near where the RCM - Sprayer was installed. FIGURE 13.
Page 44
CHAPTER 5 Hawkeye® 2 Installation Manual for ET Apache Sprayers MY 2017+...
S YSTEM DIAGRAM APPENDIX C H A P T E R A SYSTEM DIAGRAM The system diagrams begin on the next page. System Diagram: System Diagram...
Page 46
APPENDIX A FIGURE 1. Hawkeye 2, Apache MY 17 & 18 System Diagram (P/N 054-2005-004 Rev. B) HAWKEYE 2 SYSTEM DIAGRAM, APACHE MY 17 & 18 CHASSIS CABLES APACHE 720/730/1020/1025/1030/1220/1230 ITEM RAVEN P/N ET P/N DESCRIPTION RCM (MAIN ECU) 063-0173-956...
Page 47
SYSTEM DIAGRAM FIGURE 2. Hawkeye 2, Apache MY 19 & 20 System Diagram (P/N 054-2005-004 Rev. B) HAWKEYE 2 SYSTEM DIAGRAM, APACHE MY 19 & 20 CHASSIS CABLES APACHE 840/1040/1240 ITEM RAVEN P/N ET P/N DESCRIPTION RCM (MAIN ECU) 063-0173-956...
Page 48
APPENDIX A FIGURE 3. Hawkeye 2, Apache System Diagram (P/N 054-2005-004 Rev. B) Hawkeye® 2 Installation Manual for ET Apache Sprayers MY 2017+...
C ABLE AND CONNECTOR APPENDIX C H A P T E R B MAINTENANCE POWER AND ECU HARNESS MAINTENANCE 1. Disconnect the ECU harness connector and inspect for signs of moisture or corrosion. 2. If moisture or corrosion is detected, use Deoxit D5, brushes, and compressed air to clean and dry the connector.
Page 50
APPENDIX B 3. Clean contacts with a small wire brush (P/N 321-0000-477). FIGURE 2. Cleaning Contacts with a Wire Brush 4. Spray the contacts again with the deoxidizing agent to help rinse out debris. 5. Remove residue of the deoxidizing agent from the connection. CAUTION Damage to the connector seal may occur if residue is not removed from the connector.
Page 51
CABLE AND CONNECTOR MAINTENANCE 7. If not already applied, apply a single, short burst of corrosion inhibitor such as CorrosionX HD (P/N 222-0000- 020) to the NCV2 connection. Be sure the corrosion inhibitor has coated the NCV2 contacts and recessed portions of the connector.
Page 52
APPENDIX B Hawkeye® 2 Installation Manual for AGCO RoGator C-Series (RG900, RG1100, RG1300)
Page 53
Bring the defective part and proof of purchase to your Raven dealer. If the dealer approves the warranty claim, the dealer will process the claim and send it to Raven Industries for final approval. The freight cost to Raven Industries will be the customer’s responsibility.
Page 54
Bring the defective part and proof of purchase to your Raven dealer. If the dealer approves the warranty claim, the dealer will process the claim and send it to Raven Industries for final approval. The freight cost to Raven Industries will be the customer’s responsibility.
Need help?
Do you have a question about the Hawkeye 2 and is the answer not in the manual?
Questions and answers