Hawkeye® 2 Installation Manual for Case IH Patriot/Trident (MY 2017 and Newer) 016-2005-005 Rev. A 3/2021 E35630 Copyright 2021...
Page 2
Raven systems, or products used as components of systems, which rely upon the reception of these signals or availability of these services. Raven Industries accepts no responsibility for the use of any of these signals or services for other than the stated purpose.
Table of Contents Chapter 1 Important Information..................1 Safety ....................................1 Agricultural Chemical Safety .............................. 2 Electrical Safety ..................................2 Touch Screen .................................... 2 Recommendations and Best Practices ........................ 3 Harness Routing ..................................3 Chapter 2 Introduction......................5 Make and Model Compatibility ..........................
Page 4
Table of Contents Hawkeye® 2 Installation Manual for Case IH Patriot/Trident (MY 2017 and Newer)
• Do not operate this Raven system or any agricultural equipment while under the influence of alcohol or an illegal substance. • Be alert and aware of surroundings and remain in the operator seat at all times when operating this Raven system.
• Do not connect the power leads to the battery until all system components are mounted and all electrical connections are completed. • Always start the machine before initializing this Raven system to prevent power surges or peak voltage. • To avoid tripping and entanglement hazards, route cables and harnesses away from walkways, steps, grab bars, and other areas used by the operator or service personnel when operating or servicing the equipment.
The word “harness” is used to describe any electrical cables and leads, both bundled and unbundled. Use the following guidelines and recommendations when connecting and routing harnesses while installing or maintaining this Raven system: • Leave protective caps/covers over harness connectors until needed to avoid dirt and moisture from contaminating electrical circuits.
Page 8
CHAPTER 1 Hawkeye® 2 Installation Manual for Case IH Patriot/Trident (MY 2017 and Newer)
I NTRODUCTION CHAPTER C H A P T E R 2 MAKE AND MODEL COMPATIBILITY Hawkeye® 2 is a pressure-based product control system and allows for precise sprayer application over a range of conditions and reduced spray drift. Each nozzle is controlled by an individual pulsing valve giving you a consistent spray pattern as speed and conditions change.
The following components must be installed with the Hawkeye® 2 nozzle control system: • Updated software on field computers or control monitors • PWM pump control valve • Raven compatible flow meter • Raven compatible pressure transducer • 80 (or finer) mesh strainer NOTE: Air induction style spray tips should not be used with the Hawkeye®...
Page 14
CHAPTER 2 FIGURE 4. Hawkeye® 2 Case IH Patriot/Trident MY17+, 120’/10” Boom Kit Components (P/N 117-2005- 004 Rev. A) Hawkeye® 2 Installation Manual for Case IH Patriot/Trident (MY 2017 and Newer)
Fuse, Mini-Blade Type 15 Amp 510-1003-041 UPDATES Raven software and documentation updates may be made available periodically on the Raven Applied Technology web site: www.ravenhelp.com At Raven Industries, we strive to make your experience with our products as rewarding as possible.
Page 24
CHAPTER 2 Hawkeye® 2 Installation Manual for Case IH Patriot/Trident (MY 2017 and Newer)
I NSTALLATION PREPARATION CHAPTER C H A P T E R 3 Perform the following procedure to prepare the implement for installation of the Hawkeye® 2 nozzle control system. CAUTION Chemical residues may be present. Thoroughly bleed pressure from chemical lines and rinse the system with clean water prior to installing or servicing fittings, hoses, valves, or nozzles in the application system.
Page 26
CHAPTER 3 FIGURE 1. Nozzle Body Cap and Diaphragm Removed Cap and Diaphragm Removed Hawkeye® 2 Installation Manual for Case IH Patriot/Trident (MY 2017 and Newer)
H AWKEYE® 2 NCV AND BOOM CHAPTER C H A P T E R 4 CABLE INSTALLATION HAWKEYE® 2 NOZZLE CONTROL VALVE INSTALLATION BEST PRACTICES AND RECOMMENDATIONS • Do not connect battery leads until all cables are installed and connected. •...
CHAPTER 4 BOOM CABLE ROUTING AND CONNECTION BEST PRACTICES AND RECOMMENDATIONS • Route the Hawkeye® 2 inner, mid, and outer boom cables along existing cables or plumbing to avoid cable damage. • Route cables to avoid pinch points and to avoid stretching the cable during folding and unfolding operations. Pay special attention to cable routing near folding or break-away points.
Page 29
HAWKEYE® 2 NCV AND BOOM CABLE INSTALLATION NOTE: Keep the boom connections clean and off the ground while routing. Do not secure cables with cable ties until all cables are in place and routings are checked for pinch points and other interferences. Ensure sufficient slack is available at fold and break-away joints to allow for full range of motion without stretching the cable.
Page 30
CHAPTER 4 8. Once all boom cables are routed along the boom as desired, begin connecting the boom cables to the Hawkeye® 2 NCVs previously installed. 9. Use provided cable ties to secure the boom cables to the boom components as needed to ensure they are secure.
R CM - SPRAYER MOUNTING CHAPTER C H A P T E R 5 AND CONNECTION MOUNTING PLATE PREPARATION 1. Locate the Product Controller II (PCII) ECU mounted on the rear center rack of the sprayer. FIGURE 1. PCII ECU and Power Management Module Fasteners Securing Relays Hawkeye®...
CHAPTER 5 RCM - SPRAYER INSTALLATION INSTALL THE MOUNTING PLATE AND RCM - SPRAYER 1. Locate the RCM - Sprayer mounting bracket (P/N 107-0172-670), M6 flathead screws, and flanged lock nuts provided with the Hawkeye® 2 kit. 2. Using the flathead screws and lock nuts provided, secure the RCM - Sprayer mounting plate to the ECU bracket where the PCII was previously removed.
RCM - SPRAYER MOUNTING AND CONNECTION INSTALL THE RCM - SPRAYER & POWER CABLES 1. Locate the RCM - Sprayer cable (P/N 115-2005-077) provided in the kit. 2. Identify the three RCM - Sprayer connectors (two black, one gray) and connect these to the RCM - Sprayer. FIGURE 4.
Page 34
CHAPTER 5 4. Connect the connector labeled “ECU Power” to the mating 2-pin receptacle near the top of the center rack frame where the PCII ECU cable was previously connected, as shown in Figure 6, “ECU Power Connection,” below. FIGURE 6. ECU Power Connection 5.
RCM - SPRAYER MOUNTING AND CONNECTION 10. Connect the round 19-pin connectors labeled “Left Boom” and “Right Boom” to their respective inner boom cables installed previously, as shown in Figure 7, “Left and Right Inner Boom Cable Connections,” below. FIGURE 7. Left and Right Inner Boom Cable Connections 11.
Page 36
CHAPTER 5 Hawkeye® 2 Installation Manual for Case IH Patriot/Trident (MY 2017 and Newer)
S YSTEM DIAGRAM APPENDIX C H A P T E R A SYSTEM DIAGRAM The system diagram is shown on the next page. System Diagram: System diagram...
Page 38
APPENDIX A The example below is a generic system diagram and is for reference purposes only. Hawkeye® 2 Installation Manual for Case IH Patriot/Trident (MY 2017 and Newer)
C ABLE AND CONNECTOR APPENDIX C H A P T E R B MAINTENANCE POWER AND RCM - SPRAYER HARNESS MAINTENANCE 1. Disconnect the RCM - Sprayer harness connector and inspect for signs of moisture or corrosion. 2. If moisture of corrosion is detected, use Deoxit D5, brushes, and compressed air to clean and dry the connector.
Page 40
APPENDIX B 2. Spray the connection with a deoxidizing agent (DeoxIT D5 is recommended (P/N 222-4001-006)). FIGURE 1. Deoxidizing Agent Applied to Connection 3. Clean contacts with a small wire brush (P/N 321-0000-477). FIGURE 2. Connection Contact Cleaning 4. Spray the contacts again with the deoxidizing agent. This will rinse out debris. 5.
Page 41
FIGURE 3. Compressed Air Applied for Drying 7. If not already applied, apply a single short burst of corrosion inhibitor (Corrosion X HD (Raven P/N 222-0000- 020 or available from http://www.corrosionx.com/corrosionx-heavy-duty.html)) into the NCV connection. Be sure the corrosion inhibitor has coated the NCV contacts and recessed portions of the connector.
Page 42
APPENDIX B Hawkeye® 2 Installation Manual for Case IH Patriot/Trident (MY 2017 and Newer)
Page 43
Bring the defective part and proof of purchase to your Raven dealer. If the dealer approves the warranty claim, the dealer will process the claim and send it to Raven Industries for final approval. The freight cost to Raven Industries will be the customer’s responsibility.