Raven Hawkeye Installation Manual

Nozzle control system for et apache as 720, 730, 1020, 1025, 1030, 1220, and 1230 series
Hide thumbs Also See for Hawkeye:

Advertisement

Quick Links

Hawkeye® Installation Manual
for ET Apache AS 720, 730, 1020,
1025, 1030, 1220, and 1230
Series
Manual No. 016-0171-587 Rev. C 04/17
E29377
Copyright 2017

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Hawkeye and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Raven Hawkeye

  • Page 1 Hawkeye® Installation Manual for ET Apache AS 720, 730, 1020, 1025, 1030, 1220, and 1230 Series Manual No. 016-0171-587 Rev. C 04/17 E29377 Copyright 2017...
  • Page 2 GPS, GNSS, SBAS, etc.). Therefore, Raven Industries cannot guarantee the accuracy, integrity, continuity, or availability of these services and cannot guarantee the ability to use Raven systems, or products used as components of systems, which rely upon the reception of these signals or availability of these services.
  • Page 3: Table Of Contents

    ................18 Secondary Boom Cable Routing and Connections ............18 Primary Boom Cable Routing and Connections ..............20 Chapter 5 Completing Hawkeye Ready Machine Installation .... 23 Boom Cable Connections ....................... 23 Electrical Connection ......................23 Chapter 6 Cab Preparation and Wiring ..........25 Chassis Cable Routing and Connection .................
  • Page 4 Table of Contents Chapter A Cable and Connector Maintenance........39 Power and ECU Harness Maintenance ................... 39 Hawkeye Boom Harness Connector Maintenance ..............39 ii Hawkeye® Installation Manual for ET Apache AS 720, 730, 1020, 1025, 1030, 1220, and 1230...
  • Page 5: Chapter 1 Important Safety Information

    Hawkeye system. • Follow all safety information presented within this manual. • If you require assistance with any portion of the installation or service of Raven equipment, contact a local Raven dealer for support. • Follow all safety labels affixed to system components. Be sure to keep safety labels in good condition and replace any missing or damaged labels.
  • Page 6: Instructions For Wire Routing

    • Drive shafts, universal joints and hitches (i.e. 3-point hitch) • Pulleys, gears, sprockets • Deflection and backlash of belts and chains • Adjustment zones of adjustable brackets Hawkeye® Installation Manual for ET Apache AS 720, 730, 1020, 1025, 1030, 1220, and 1230 Series...
  • Page 7 IMPORTANT SAFETY INFORMATION • Changes of position in steering and suspension systems • Moving linkages, cylinders, articulation joints, attachments • Ground engaging components For harness sections that move during machine operation: • Allow sufficient length for free movement without interference to prevent: pulling, pinching, catching or rubbing, especially in articulation and pivot points •...
  • Page 8 HAPTER Hawkeye® Installation Manual for ET Apache AS 720, 730, 1020, 1025, 1030, 1220, and 1230 Series...
  • Page 9: Introduction

    C H A P T E R 2 The Hawkeye® nozzle control system is a pressure based product control system designed for precise sprayer application in a variety of conditions. Pressure based application control provides accurate control of droplet size which reduces spray drift during field operations.
  • Page 10: Required Components

    • 80 mesh (or finer) strainer NOTE: Air induction style spray tips should not be used with the Hawkeye nozzle control system. A fan or cone style spray tip is required for the Hawkeye system to operate properly. TOOLS AND MATERIALS NEEDED The following tools are recommended for completing the installation: •...
  • Page 11: Kit Contents

    KIT CONTENTS TABLE 2. Components Included with Every Kit Picture Item Description Part Number Qty. Not Pictured Manual - Hawkeye® Calibration and Operation 016-0171-584 Not Pictured Manual - Apache Hawkeye Installation 016-0171-587 Cable - ISO Adapter 115-7303-138 Cable - ECU...
  • Page 12 Hose: End 1: 10JF; SIZE 10; Overall Length: 18”; 214-1001-072 END 2: 10JF Hose: END1: 8JF45; SIZE: 8; Overall Length: 18; 214-1001-068 END 2: 8JF Grommet,.3/4” ID x 1-5/8” OD 315-1001-006 Hawkeye® Installation Manual for ET Apache AS 720, 730, 1020, 1025, 1030, 1220, and 1230 Series...
  • Page 13 INTRODUCTION TABLE 3. Boom Specific Cable Numbers Cable Boom Configuration Left Primary (Qty 1) Right Primary (Qty 1) Secondary (Qty 2) 60’/90’ Combo Boom 115-7303-056 115-7303-056 115-7303-059 15” Spacing 60’/90’ Combo Boom 115-7303-056 115-7303-057 115-7303-059 20” Spacing 90’ Boom 115-7303-037 115-7303-037 115-7303-038 15”...
  • Page 14: System Diagrams

    HAPTER SYSTEM DIAGRAMS Review the three system diagrams below before starting an installation. Hawkeye® Installation Manual for ET Apache AS 720, 730, 1020, 1025, 1030, 1220, and 1230 Series...
  • Page 15 INTRODUCTION Manual No. 016-0171-587 Rev. C...
  • Page 16 HAPTER Hawkeye® Installation Manual for ET Apache AS 720, 730, 1020, 1025, 1030, 1220, and 1230 Series...
  • Page 17: Updates

    To serve you best, please send an email with the following information to techwriting@ravenind.com -Hawkeye® Installation Manual for ET Apache AS 720, 730, 1020, 1025, 1030, 1220, and 1230 Series -Manual No. 016-0171-587 Rev. C -Any comments or feedback (include chapter or page numbers if applicable).
  • Page 18 HAPTER Hawkeye® Installation Manual for ET Apache AS 720, 730, 1020, 1025, 1030, 1220, and 1230 Series...
  • Page 19: Installation Preparation

    I NSTALLATION PREPARATION CHAPTER C H A P T E R 3 Perform the following procedure to prepare the implement for installation of the Hawkeye nozzle control system. CAUTION Chemical residues may be present. Thoroughly bleed pressure from chemical lines and rinse the...
  • Page 20 HAPTER Hawkeye® Installation Manual for ET Apache AS 720, 730, 1020, 1025, 1030, 1220, and 1230 Series...
  • Page 21: Chapter 4 Boom Installation

    • Do not connect battery leads until all cables are installed and connected. • If a dual channel turret nozzle body is installed on the implement, always mount the Hawkeye nozzle control valve to the straight nozzle port to avoid excessive pressure drop across the nozzle.
  • Page 22: Boom Cable Routing And Connection

    VALVE MOUNTING INTERFERENCE AND OBSTRUCTIONS In some locations on the spray boom, boom equipment or hardware may interfere with mounting the Hawkeye nozzle control valves. In these locations, it may be necessary to rotate the nozzle control valve or to relocate existing hardware to provide additional clearance.
  • Page 23 If there is interference between the connector and boom components, remove the connector back shell. Refer to Figure 5 on page 20. 4. If not already applied, apply a single short burst of corrosion inhibitor (Corrosion X HD (Raven P/N 222-0000- 020 or available from http://www.corrosionx.com/corrosionx-heavy-duty.html)) into the NCV connection. Be sure the corrosion inhibitor has coated the NCV contacts and recessed portions of the connector.
  • Page 24: Primary Boom Cable Routing And Connections

    The primary boom cables must be routed such that the connector with female pins is located at the mid-boom fold point of the left or right boom and will connect to the secondary boom cable. Hawkeye® Installation Manual for ET Apache AS 720, 730, 1020, 1025, 1030, 1220, and 1230 Series...
  • Page 25 BOOM INSTALLATION FIGURE 6. Primary Cable Ends Male Connector Female Receptacle To Center Rack/Chassis Connector To Secondary Boom Cable/Mid-Boom Fold Point 2. Starting at the center of the implement, feed the female receptacle end of the primary boom cable through the boom framework along existing cable or plumbing runs and through any existing cable retention devices as appropriate.
  • Page 26 HAPTER Hawkeye® Installation Manual for ET Apache AS 720, 730, 1020, 1025, 1030, 1220, and 1230 Series...
  • Page 27: Chapter 5 Completing Hawkeye Ready Machine Installation

    MACHINE INSTALLATION If the machine is Hawkeye ready, complete the steps in this chapter to complete the installation. If the machine is not Hawkeye ready, skip to “Cab Preparation and Wiring” on page 25. Hawkeye ready is a factory option for 2017+ model years.
  • Page 28 3. Open the hood of the sprayer to access the power connections. 4. Locate the Ground Aux. terminals on the power connection. 5. Connect the ground cable from the Hawkeye power cable (115-7303-144) to the ground aux terminal. 6. Connect the power ring to the Aux. Power terminal.
  • Page 29: Chapter 6 Cab Preparation And Wiring

    C AB PREPARATION AND CHAPTER C H A P T E R 6 WIRING CHASSIS CABLE ROUTING AND CONNECTION BEST PRACTICES AND RECOMMENDATIONS • Do not connect battery leads until all cables are installed and connected. • Route chassis cabling along existing cabling or plumbing to help avoid pinch points or stretching the cable during normal equipment operation.
  • Page 30: Cab Connections

    8. Locate the black 12-pin plug on the ISO/CAN adapter cable (P/N 115-7303-138) and connect it to the black receptacle of the ISO Boom Sense/Speed ECU. Hawkeye® Installation Manual for ET Apache AS 720, 730, 1020, 1025, 1030, 1220, and 1230 Series...
  • Page 31 CAB PREPARATION AND WIRING FIGURE 3. ISO Boom Sense/Speed ECU Connections 9. Use the hardware retained from removing the CAN Boom Sense/Speed Node to Mount the new ISO Boom Sense/Speed ECU in the previous location. 10. Route the 4-pin ISObus plug connection through the knockout hole and grommet in the floor while ensuring the connector is dropping to a clean, dry, safe spot under the cab.
  • Page 32 HAPTER Hawkeye® Installation Manual for ET Apache AS 720, 730, 1020, 1025, 1030, 1220, and 1230 Series...
  • Page 33: Isobus Ecu Mounting And Connection

    • Do not connect battery leads until all cables are installed and connected. • If a protected mounting location is not available on the equipment, mount the Hawkeye product controller II ECU with the connectors facing down toward the ground to help keep moisture from accumulating in the ECU.
  • Page 34: Retrofit Cable Installation

    Refer to Figure 3, “Product Controller II ECU Connections,” for the connector orientation. FIGURE 3. Product Controller II ECU Connections Gray Green Brown Black Hawkeye® Installation Manual for ET Apache AS 720, 730, 1020, 1025, 1030, 1220, and 1230 Series...
  • Page 35 If there is an existing ISObus controller, it is necessary to remove the terminator from the ECU Harness (-143) and connect it to the machine cabling and the Hawkeye harness using tee connections. Place the terminator at the end of the ISObus.
  • Page 36 Valve Connector 7. Connect the ISO tank fill plug on the Hawkeye ECU harness (P/N 115-7303-143) to the tank fill receptacle on the machine cable harness (if applicable). Hawkeye® Installation Manual for ET Apache AS 720, 730, 1020, 1025, 1030, 1220, and 1230 Series...
  • Page 37 FIGURE 9. High Current and Switched Power Connection High Current Switched Power 9. Connect the right boom 19-pin plug of the Hawkeye ECU harness (P/N 115-7303-143) to the right primary boom cable receptacle installed in Chapter 4, Nozzle Control Valve Installation. Manual No. 016-0171-587 Rev. C...
  • Page 38: Pwm Valve Installation And Wiring

    Connection Left Boom Connection 10. Connect the left 19-pin plug of the Hawkeye ECU harness (P/N 115-7303-143) to the left primary boom cable receptacle installed in Chapter 4, Nozzle Control Valve Installation. PWM VALVE INSTALLATION AND WIRING 1. Locate the product pump.
  • Page 39 ISOBUS ECU MOUNTING AND CONNECTION FIGURE 12. PWM Valve on Bracket PWM Valve Bracket PWM Valve 5/16” Nut 5/16” Bolt Washer 6. Remove the four plastic plugs installed in the T1, T2, P, and M ports of the PWM valve. 7.
  • Page 40 45° hydraulic motor port disconnected in step 12. 14. Connect the 2-pin plug from the Hawkeye harness (routed in Section 5, Cab Preparation and Wiring to the receptacle located towards the top of the PWM valve. Refer to Figure 15 on page 36 for a completed PWM valve assembly.
  • Page 41: Electrical Connection

    3. Open the hood of the sprayer to access the power connections. 4. Locate the Ground Aux. terminals on the power connection plate. 5. Connect the black ground cable from the Hawkeye power cable (P/N 115-7303-144) to the ground aux terminal.
  • Page 42 HAPTER Hawkeye® Installation Manual for ET Apache AS 720, 730, 1020, 1025, 1030, 1220, and 1230 Series...
  • Page 43 4. Reattach the connectors. HAWKEYE BOOM HARNESS CONNECTOR MAINTENANCE Prior to connecting the Hawkeye boom cable to the Hawkeye Nozzle Control Valves (NCV), perform the following steps to all 6-pin NCV connectors and 19-pin circular connectors between the boom cables and ECU cable connections to ensure high quality connections: 1.
  • Page 44 If using compressed air from a large volume air compressor, be sure the lines are free of moisture. Hawkeye® Installation Manual for ET Apache AS 720, 730, 1020, 1025, 1030, 1220, and 1230 Series...
  • Page 45 CABLE AND CONNECTOR MAINTENANCE 7. If not already applied, apply a single short burst of corrosion inhibitor (Corrosion X HD (Raven P/N 222-0000- 020 or available from http://www.corrosionx.com/corrosionx-heavy-duty.html)) into the NCV connection. Be sure the corrosion inhibitor has coated the NCV contacts and recessed portions of the connector.
  • Page 46 PPENDIX Hawkeye® Installation Manual for ET Apache AS 720, 730, 1020, 1025, 1030, 1220, and 1230 Series...
  • Page 47 Bring the defective part and proof of purchase to your Raven dealer. If the dealer approves the warranty claim, the dealer will process the claim and send it to Raven Industries for final approval. The freight cost to Raven Industries will be the customer’s responsibility. The Return...
  • Page 48 How Can I Get Service? Bring the defective part and proof of purchase to your Raven dealer. If the dealer approves the warranty claim, the dealer will process the claim and send it to Raven Industries for final approval.

Table of Contents