Commissioning; Electrical And Piping - Deckma Hamburg OMD-2008 Series Instruction Manual

15ppm bilge alarm
Hide thumbs Also See for OMD-2008 Series:
Table of Contents

Advertisement

11.

Commissioning

For operating and servicing on board, please carefully read the instruction manual and
ensure, that the safety recommendations are considered. Read important notice as well.
Ensure that wires are correctly connected to the terminal blocks inside the computer
housing and ensure that the connection to the Measuring Cell is in place (refer to Figure
2. Construction OMD-2008 to Figure 14. Construction OMD-2008 EVFC, respectively). On
completion of the installation, cabling, and piping, carry out the following checks:

11.1 Electrical and Piping

a) Check that the power supply is connected to the terminals 1&2 of the terminal block.
b) Check that the grounding (PE) has been made according to the relevant regulations.
c) Check that the cabling of the automatic stopping device (Back-to-bilge-valve) and to
the alarm system is according the IMO Requirements.
d) Check all piping connections and rectify as appropriate.
e) Check the sample supply and the fresh water supply.
For instruments equipped with an Automatic or Manual Cell Cleaning Unit, check the
following points:
f) Check, that the Cell Cleaning Device is fitted correctly
g) Check, that the push in connectors and hoses are fitted correctly (Automatic Cleaning
System only).
h) Check that the Air Supply is between 4 – 6 bar.
During the installation of the unit it is recommended to wear safety boots, for the unit is
about 6 kg and it could come to injuries.