7.3

Installation OMD-2008 EVFC

Computer Unit and Measuring Cell assembly should be mounted close to each other.
Please refer to the following drawing for mounting dimensions.

Figure 15. Installation OMD-2008 EVFC

Pipe connections are prepared for 10mm OD stainless steel (clean water) and 6 mm OD
stainless steel or copper pipes (sample water/ outlet). Adapter fittings for other pipe
diameters are available upon request. Working space for maintenance and operation is
recommended in front of and above the instrument.