Installation - Deckma Hamburg OMD-2005 Instruction Manual

Table of Contents

Advertisement

6.0

INSTALLATION

See Section 2 for important notes concerning installation.
The OMD-2005 Monitor should be located as close as possible to the oily water
separator to minimize response delays. According MEPC.107(49) the layout of
the installation should be arranged so that the overall response time (including
the response time of the 15 ppm Bilge Alarm, which is less than 5 s.) between an
effluent discharge from the 15 ppm Bilge Separator exceeding 15 ppm, and the
operation of the Automatic Stopping Device preventing overboard discharge,
should be as short as possible and in any case not more than 20 s.
Mount the OMD-2005 Monitor by means of 6 x M8 screws on to a rigid vertical
surface and preferably with the display panel of the monitor at eye level. For
service and maintenance sufficient space to all sides should be available.
Care must be taken at mounting of the pipes connections to avoid any torsion of
the housing and damage of the instrument.
Fig. 2
Issue: 27.05.08
DECKMA HAMBURG GmbH
(Refer to Fig. 2 and Fig. 3)
OMD-2005
Oil Monitoring Device
ON
Alarm 1
Alarm 2
System
OK
DECKMA HAMBURG
www.deckma.com
Instruction Manual OMD-2005
O U T 1 / 4 "
C L E A N W A T E R 1 / 4 "
D E C K M A H A M B U R G
D H 7 5 4 5 0
S A M P L E 1 / 4 "
Page 9 of 25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents

Save PDF