Installation and Removal

Installation and Removal
8

8.1 Installation

8.1.1 Installation on a Carrier Rail

The carrier rail must optimally support the EMC measures integrated into the system and
the shielding of the internal data bus connections.
Place the onto the DIN rail from the top and snap it into position.

8.2 Removal

8.2.1 Removal from Carrier Rail

To remove the industrial managed switch from the carrier rail, insert a suitable tool into
the metal tab under the switch and deflect the metal tab downward.
You can then release the switch down from the carrier rail and remove it upwards.
26
Product manual | Version: 1.2.0
Industrial Managed Switch
852-1322