Installation And Removal; Installation; Installation On A Carrier Rail; Removal - WAGO 852-112/000-001 Manual

Industrial switches
Table of Contents

Advertisement

852-112/000-001

Installation and Removal

7

7.1 Installation

CAUTION
Hot Surface!
The surface of the housing heats up during operation. Under special conditions (e.g., in
the event of a fault or increased surrounding air temperature), touching the product may
cause burns!
Allow the product to cool down before touching it.

7.1.1 Installation on a Carrier Rail

The carrier rail must optimally support the EMC measures integrated into the system and
the shielding of the internal data bus connections.
Place the onto the DIN rail from the top and snap it into position.

7.2 Removal

7.2.1 Removal from Carrier Rail

To remove the industrial managed switch from the carrier rail, insert a suitable tool into
the metal tab under the switch and deflect the metal tab downward.
You can then release the switch down from the carrier rail and remove it upwards.
Product manual | Version: 1.0.0
Industrial Eco Switch
Installation and Removal
Figure 9: Industrial Eco Switch with DIN rail adapter
23

Advertisement

Table of Contents
loading

Table of Contents