5-28. Reel Shift Motor Replacement
9. Reel Shift Assembly Installation
(1) Connect the two harnesses disconnected in
step 2 to the reel shift assembly.
(2) Tighten the three screws.
10. Grease Applying
(1) Wipe the grease on the warm gear and clean
it.
(2) Apply grease to the warm gear.
11. RS Table Block Assembly Installation
Refer to steps 9 through 13 in Section 5-9-1.
Adjustment after Replacement
12. Cassette Pillar Height Confirmation
Refer to Section 5-9-3.
13. Reel Shift Motor Operation Check
Refer to Section 4-2-2 in Maintenance Manual
Part 1.
(C016: REEL SHIFT MOTOR)
5-180
Screw (PWH3 x 8)
Screw (PWH3 x 8)
Screw (PWH3 x 8)
Harness
Harness
Reel Shift Assembly Installation
Grease Applying
Reel shift assembly
Warm gear (gease applying)
DNW-A100/A50/A45
DNW-A100P/A50P/A45P