Adjustment after Replacement
18. Reel Motor Shaft Slantness
Confirmation
Refer to Section 5-9-2.
19. Reel Table Assembly Installation
(1) Clean the circumference of the reel table
assembly.
(2) While moving the reel brake in the direction
indicated by the arrow to make free, pass the
reel table assembly through the reel motor
shaft.
n
Tighten the two set screws of the reel table
assembly after reel table height confirmation
is complated.
20. Cassette Pillar Height Confirmation
Refer to Section 5-9-3.
21. Reel Table Height Confirmation
Refer to Section 5-9-4.
22. Reel Brake Clearance Confirmation
Refer to Section 5-9-5.
23. Reel Brake Release Confirmation
Refer to Section 5-9-6.
24. Brake Solenoid Operation
Confirmation
Refer to Section 4-2-2 in Maintenance Manual
Part 1.
(C021: S REEL BRAKE,
C022: T REEL BRAKE)
DNW-A100/A50/A45
DNW-A100P/A50P/A45P
S reel table assembly
S reel brake
S reel motor shaft
Reel Table Assembly Installation
5-15. Brake Solenoid Replacement
T reel table assembly
Cleaning
T reel brake
T reel motor shaft
5-109