Preparing For Work Before First Use - PRONAR T740 Manual

Table of Contents

Advertisement

4.1 PREPARING FOR WORK BEFORE FIRST USE

The manufacturer guarantees that the trans-shipment trailer is fully operational and has been
checked according to quality control procedures and is ready for normal use. This does not
release the user from an obligation to check the machine's condition after delivery and before
first use. The machine is delivered to the user in a completely assembled state.
Before commencing work, machine operator must inspect the technical condition of the trans-
shipment trailer and prepare it for test start-up. The user must familiarise himself with the
content of these instructions and additional publications attached to machine, observe all
recommendations, understand the design and the principle of machine operation
IMPORTANT!
Before proceeding to hitching to tractor the user must familiarise himself with the
content of these instructions and additional publications attached to machine and
observe all recommendations.
External inspection
Check completeness of machine (standard and additional equipment).
Check condition of protective paint coat,
Check technical condition and set of safety guards.
Inspect trailer's individual components for mechanical damage resulting from
incorrect transport (dents, piercing, bent or broken components),
Check technical condition of tyres and tyre pressure,
Check technical condition of elastic hydraulic conduits,
Check technical condition of pneumatic conduits,
Check that there are no hydraulic oil leaks.
Prepare trans-shipment trailer for first start-up
Check all lubrication points, lubricate the machine as needed according to
recommendations provided in section 5,
4.2

Advertisement

Table of Contents
loading

Table of Contents