Preparing For Work Before The First Use; Checking The Trailer After Delivery; Preparing A Trailer For First Hitching - PRONAR PT512 Operator's Manual

Table of Contents

Advertisement

Pronar PT512

4.1 PREPARING FOR WORK BEFORE THE FIRST USE

4.1.1 CHECKING THE TRAILER AFTER DELIVERY

The manufacturer guarantees that the trailer is fully operational and has been checked
according to quality control procedures and is ready for normal use. This does not free the
user from an obligation to check the machine's condition after delivery and before the first
use. The machine is delivered to the user completely assembled.
Before commencing work, the trailer operator must inspect the technical condition of the
trailer and prepare it for the first start-up. Carefully read this Operator's Manual, observe all
its recommendations and understand the machine design and the principle of its operation.
ATTENTION
Before proceeding to hitching the trailer and starting its operation, carefully read this
Operator's Manual and observe all its recommendations.
External inspection
Check completeness of the machine (standard and optional equipment).
Check the condition of protective paint coating.
Inspect the trailer's components for mechanical damage resulting from
incorrect transport (dents, pierced, bent or broken components).
Check the technical condition of tires and tire air pressure.
Check the technical condition of hydraulic flexible lines.
Check the technical condition of pneumatic lines.
Check that there are no hydraulic oil leaks.
Check lamps.
Check all cylinders for hydraulic oil leaks.

4.1.2 PREPARING A TRAILER FOR FIRST HITCHING

Preparation
4.2
CHAPTER 4

Advertisement

Table of Contents
loading

Table of Contents