Operation No. 11 - Inspection Of Lighting And Signalling System - PRONAR T740 Manual

Table of Contents

Advertisement

ATTENTION!
The trans-shipment trailer and tractor must not be attached if the hydraulic oil in the two
machines is of different types.
Do not use the trans-shipment trailer with damaged hydraulic system.
Tightness inspection:
5.2.11 OPERATION NO. 11 - INSPECTION OF LIGHTING AND SIGNALLING
SYSTEM.
Required service actions
Hitch trans-shipment trailer to tractor.
Switch on all lights in succession.
Check completeness and technical condition of lights.
Check completeness of all reflective lights.
Check correct mounting of triangular slow-moving vehicle sign.
Check connection conduit and conduit plug.
Check condition of conduit group and connection blocks.
ATTENTION!
Travel with unreliable lighting and signalling system is forbidden. Damaged lamp lenses,
and burned-out bulbs must be replaced before travelling.
Electrical system inspection:
After a week of use
Every 12 months of use,
daily.
Every 12 months of use,
5.15

Advertisement

Table of Contents
loading

Table of Contents