PREPARATION

SENSOR DIMENSIONS

Verify the system dimensions are entered correctly for height sensor offsets and center rack width.

BOOM ANGLE SENSOR

Ensure the automated calibration sequence is performed over flat ground. If the sensor dimensions were updated,
re-perform the boom angle sensor calibration.

HYDRAULIC OIL

For best results, perform tuning with the hydraulic oil at normal operating temperature.

BASE CONTROL EFFORT CALIBRATION

Accurate base control effort values are necessary for successful advanced tuning. Only perform a Base Control
Effort Calibration after warming the hydraulic oil. If possible, engage AutoBoom and drive slowly for two minutes
prior to performing Base Control Effort calibration. This will ensure the Solenoid coils are at operating temperature
and will give the most accurate Base Control Effort.

TARGET CONTROL EFFORT TEST

1. Select Diagnostics.
2. Select Tests.
3. Select Target Control Effort Test.
FIGURE 1. Target Control Effort Test
016-0235-002 Rev. B
A UTOBOOM XRT ADVANCED
C H A P T E R 6
TUNING
43