Figure 3-4 Removing packing materials
Step 5 Remove the plastic bag and take out the fittings box.
Step 6 Check that the UPS is intact.
1.
2.
Step 7 Remove the L-shaped bracket that secures the cabinet and the pallet, and secure
the sliding plate to the pallet by using the two M12 screws that were removed.
Figure 3-5 Removing the L-shaped brackets
Step 8 Raise the four anchor bolts to the highest position using an adjustable wrench.
Issue 15 (2022-01-30)
Visually inspect the UPS appearance for shipping damage. If it is damaged,
notify the carrier immediately.
Check that all fittings comply with the packing list. If some fittings are
missing or do not comply with the packing list, record this information and
contact the Company immediately.
NO TE
Tighten the two screws in step 2 in
the UPS is removed.
Copyright © Huawei Technologies Co., Ltd.
Figure
3-5. Otherwise, the slide plate may move when
3 Installation