UPS5000-E-(50 kVA–300 kVA)
User Manual (50 kVA Power Modules)
●
Issue 15 (2022-01-30)
Figure 3-85 Removing small covers from the bottom of the cabinet
Drill holes into the large cover for routing cables.
a.
Remove all small covers from the bottom of the cabinet.
b.
Remove the two large covers from the top of the cabinet, drill holes into
them, and install them to the positions where the small covers were
originally.
Figure 3-86 Hole positions
Copyright © Huawei Technologies Co., Ltd.
3 Installation
120