Huawei UPS5000-E User Manual page 135

Hide thumbs Also See for UPS5000-E:
Table of Contents

Advertisement

UPS5000-E-(50 kVA–300 kVA)
User Manual (50 kVA Power Modules)
Issue 15 (2022-01-30)
Figure 3-94 Removing small covers from the top of the cabinet
Drill holes into the large cover for routing cables.
a.
Remove small covers from the top.
b.
Remove the two large covers from the rear top of the cabinet, drill holes
into them, and install them to the positions where the small covers were
placed.
Figure 3-95 Hole positions
Copyright © Huawei Technologies Co., Ltd.
3 Installation
126

Advertisement

Table of Contents
loading

Table of Contents