Installation
Introduction
This section reviews installation for the HP 5890 SERIES II (hereafter
referred to as HP 5890). The following topics are discussed:
C
C
C
C
C
C
Shipment checklist
Retain shipping containers and material until contents are checked for
completeness and instrument performance is verified.
Items received should be checked against packing lists. If there are
discrepancies, contact your local Hewlett•Packardoffice immediately.
20
Inspection of shipped materials
Instrument cooling
Connecting supply gases
Connecting cryogenic cooling
Power considerations
Signal cables