Installation
Connecting supply gases
Connection between the valve and liquid N
and as short as possible so liquid, rather than gas, is supplied to the inlet
valve. Foam tubing used for refrigeration and air•conditioninglines is
suitable insulation. Insulation should cover as much as possible.
Liquid N
Caution
excess pressure. Release pressure is set by the supplier. The pressure
setting should be in the range 138 to 207 kPa (20 to 30 psi) for proper
operation. Lower pressures may cause inadequate cooling; high
pressures may cause uncontrolled cooling, damaging oven and
contents.
Connect tubing to the liquid N

Gas supply checklist

To connect lines to the appropriate gas supply(ies), you should have
completed the following steps:
1. Ensure all gas supplies are off prior to connection and that all
2. Route gas supply tubing along the oven wall (using the wall slots
3. Select the appropriate tube connections for gas supplies and make
4. Pressurize the system.
5. Compensate for pressure differences between the source and the
6. Leak test each connection.
7. Install cryogenic cooling gas supply (if applicable).
34
cylinders are equipped with a safety relief valve to prevent
2
unconnected fittings are capped.
provided) to the appropriate mass flow controller or flow manifold
block.
connections.
instrument.
1
supply must be insulated
1
supply using a suitable adapter.