Komatsu PC360NLC-11 Operation & Maintenance Manual page 380

Hydraulic excavator
Table of Contents

Advertisement

MAINTENANCE PROCEDURE
5.
Pull out projections (2) (6 places) on the back of the floor
mat and remove the floor mat.
6.
Remove the cap from water drain hole (3).
7.
Flush out the dirt on the floor directly with water through
water drain hole (3).
8.
After completing the washing work, install the cap in water
drain hole (3).
9.
Fit the floor mat and secure it by inserting projections (2)
into the holes.
METHOD FOR SETTING MACHINE AT ANGLE
You can set the machine at an angle by using a slope or blocks. Consider the condition of the machine and
select the safe method.
METHOD FOR USING SLOPE
Select a solid and smooth slope.
Always block the tracks from movement, and thrust the work equipment into the ground.
1.
Stop the machine with the work equipment on the downhill side on a slope.
2.
Block the tracks from movement and thrust the work
equipment into the ground.
4-36
k
k
WARNING
MAINTENANCE

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc360lc-11

Table of Contents