Komatsu PC360NLC-11 Operation & Maintenance Manual page 320

Hydraulic excavator
Table of Contents

Advertisement

TRANSPORTATION
1.
Remove bolts (1), and remove handrail (A) and cover (2).
2.
Remove bolts (3), and remove handrail (B) and cover (4).
3.
Remove bolts (5), and remove handrail (C).
METHOD FOR INSTALLING HANDRAIL
Install handrails (C), (B), and (A) in this order.
1.
Install handrail (C), then tighten them with bolts (5).
2.
Install handrail (B) and cover (4), then tighten them with bolts (3).
3.
Install handrail (A) and cover (2), then tighten them with bolts (1).
Tightening torque: 98 to 123 Nm{10.0 to 12.5 kgm}
METHOD FOR REMOVING AND INSTALLING CLIMBING HANDLE
When removing and installing handle (A) for transportation of
the machine, etc., perform the operation according to the fol-
lowing procedure.
METHOD FOR REMOVING CLIMBING HANDLE
Remove bolt (1) and remove handle (A).
3-244
OPERATION
KS001072

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc360lc-11

Table of Contents