Levelflex M FMP40 with HART/4...20 mA
⇒
ENDRESS + HAUSER
–
+
E
Endress+Hauser
6
Commissioning
6.1
Function check
Make sure that all final checks have been completed before you start up your measuring point:
• Checklist "Post-installation check".
• Checklist "Post-connection check".
6.2
Switching on the measuring device
When the instrument is switched on for the first time, the following messages appear in a sequence
of 5 s on the display: software version, communication protocoll and language selection
⇓
⇓
⇓
Select the language
(this message appears the first time the device is
switched on)
Select the basic unit
(this message appears the first time the device is
switched on)
The current measured values PV (interface layer) and SV
(level) are displayed in the standard settings.
F
After
is pressed, you reach the group selection.
This selection enables you to perform the basic setup
Commissioning
45