Connection Process Of The Digital Outputs - Ingeteam INGECON SUN STORAGE 1Play Installation And Operation Manual

Hide thumbs Also See for INGECON SUN STORAGE 1Play:
Table of Contents

Advertisement

Connecting the digital outputs

14.3. Connection process of the digital outputs

Follow the instructions below to connect the digital outputs:
Normally open (NO)
1.
Loosen the corresponding cable gland "2.7. Description of cable inlets", remove the cap and pass the
cable through it.
2.
If you wish to use the Normally Open contact, connect the wiring in the NO and COM positions in the J36
EXT terminals. 1 RELAY and/or J44 EXT. 2 RELAY as shown in the previous figure.
3.
If you wish to use the Normally Closed contact, connect the wiring in the NC and COM positions in the
J36 EXT terminals. 1 RELAY and/or J44 EXT. 2 RELAY as shown in the previous figure.
4.
Correctly tighten the packing glands to prevent losses to the protection class, verifying that the wiring is
not taut. Check that the connection is tight.
ABH2015IQE01_ - Installation and Operation Manual
Digital output 1
Digital output 2
Normally closed (NC)
J36 EXT RELAY 1
J44 EXT RELAY 2
Ingeteam
41

Advertisement

Table of Contents
loading

Table of Contents