Consumption Grid Connection Process - Ingeteam INGECON SUN STORAGE 1Play Installation And Operation Manual

Hide thumbs Also See for INGECON SUN STORAGE 1Play:
Table of Contents

Advertisement

Ingeteam

9.4. Consumption grid connection process

To connect the consumption grid:
1.
Loosen the packing gland marked LOADS (see section "2.7. Description of cable inlets"), remove the cap
and pass the consumption grid cable through it.
2.
Use two of the ferrite cores supplied with the unit and make two turns with the L and N wiring from the
storage system.
3.
Connect the push-in type terminals marked as J56 LOADS, respecting the polarities. The operation of
this type of terminal is described in "7. Connection/disconnection of wiring in push-in type terminals".
4.
Correctly tighten the cable gland to prevent losses to the protection class, verifying that the wiring is not
taut.
30
Connecting the consumption grid
L
Line
N
Neutral
Ground
ABH2015IQE01_ - Installation and Operation Manual

Advertisement

Table of Contents
loading

Table of Contents