  • Page 1 INGECON SUN STORAGE 1PLAY Use and Settings of the ISS 1Play working with LG CHEM RESU 3.3 / 6.5 /10 batteries Ingeteam Power Technology S. A. Technical Guide...
  • Page 2: Table Of Contents

    INGECON SUN STORAGE 1Play Table of contents Introduction ..............................3 Setting the battery pack ..........................4 Connecting the battery pack to the inverter ....................5 Wiring of communication cable ......................5 Setting the inverter ............................8 DC Battery type ........................... 8 4.1.1 For ISS 1Play TL M .........................
  • Page 3: Introduction

    Minimum Firmware Version used in the ISS 1Play TL: Inverter: ABH1002_R Display: ABH1003_H Minimum Firmware Version used in the ISS 1Play TL M: • Inverter: ABH1007_ For further details, check the “List of approved lithium batteries” available on Ingeteam website. Technical Guide 22/04/2020 3/10...
  • Page 4: Setting The Battery Pack

    INGECON SUN STORAGE 1Play 2 Setting the battery pack This chapter describes how to configure the rotary and DIP switches of the LG RESU battery to work with the ISS 1Play. Part Name Circuit Number Settings Description SW3 (CAN H) Nº...
  • Page 5: Connecting The Battery Pack To The Inverter

    INGECON SUN STORAGE 1Play 3 Connecting the battery pack to the inverter The instructions to connect the battery pack to the inverter are described in the “Installation Manual of LG RESU 3.3 / 6.5 /10” Please, take into account the following technical notes: •...
  • Page 6 INGECON SUN STORAGE 1Play Use this method when making a communication wire to be connected between the LG RESU and the ISS 1Play: 1- Cut a cable shorter than 3 meters long. 2- Strip from 2.5 to 5cm of the outer sheath at the end of the cable 3- Untwist and separate each pair of wires.
  • Page 7 INGECON SUN STORAGE 1Play Connect the RJ45 terminal to the connector under the cover named “connection kit”, located inside the battery pack. Connect the three wires to the inverter in the CAN communication terminal. Use a cable gland provided to insert the cable within the inverter.
  • Page 8: Setting The Inverter

    Confirm the desired selection by pressing the “Write” button. A message to confirm the modification will pop 4.1.2 For ISS 1Play TL This can be done using the “Ingecon Sun Manager” software package (downloadable on www.ingeteam.com) or through the display: Using Ingecon Sun Manager: Settings →...
  • Page 9 INGECON SUN STORAGE 1Play When the permission is given, go to: MAIN MENU > CONFIGURATION > BATTERY > LITHIUM > LG CHEM > RESU LV SERIES 48V Confirm the desired selection by pressing the “OK” button. A message to confirm the modification will pop up. A final screen that shows that the process has been completed will be shown on the display.
  • Page 10: Final Check

    INGECON SUN STORAGE 1Play 5 Final check This chapter describes the instructions to check that all the connections and settings have been successfully done. 1) Make sure that the CAN communication wire from the LG RESU battery to the inverter is connected. 2) Make sure that the battery circuit breaker is in ON position.