Preparation for installing the unit
The surrounding atmosphere must be clean and at temperatures above 40 ºC, the relative humidity must be
between 4% and 50%. Higher percentages of relative humidity up to 95% are tolerated at temperatures below
30 ºC.
It should be borne in mind that moderate condensation may occasionally occur as a consequence of temperature
variations. For this reason, apart from the unit's own protection, it is necessary to monitor these units once they
have been started up on sites where the conditions described above are not expected to be present.
In the event of condensation, never apply voltage to the unit.

5.3. Supporting Surface and Fastening

To guarantee good heat evacuation and promote sealing, the units must be placed on a perfectly vertical wall or,
failing this, with a slight slope of a maximum of +80° or -80°.
Reserve a solid wall to which to attach the unit. It must be possible to drill the wall and fit suitable wall anchors
and self-tapping screws to support the unit's weight.

5.4. Protection of the connection to the consumption grid

Thermomagnetic circuit breaker
A thermomagnetic circuit breaker must be installed on the connection between the inverter and the consumption
grid.
The following gable provides the necessary data for the installer.
INGECON SUN STORAGE 1PLAY
You must take into account when selecting the protection that the ambient working temperature influences the
maximum current permitted by these protections as indicated by the manufacturer.

5.5. Protection of the connection to the auxiliary genset

Thermomagnetic circuit breaker
A thermomagnetic circuit breaker must be installed on the connection from the inverter to the auxiliary genset.
The following table provides the necessary data for the selection of these devices by the installer.
ABH2015IQE01_ - Installation and Operation Manual
Installations with the inverter disconnected to the distribution grid
for the consumption grid
3TL
6TL
Maximum current
13 Arms
26 Arms
Rated current for the
thermomagnetic circuit
breaker
20 Arms
32 Arms