Pto Mount Arm Installation - Peco 22131501 Operator's Manual

Pto-x/engine driven grass collection system toro z-master 4000 series 60" deck
Table of Contents

Advertisement

PTO Mount Arm Installation

PTO-X
PTO-X Unit Instructions
Position the Mount Arm / Top Bracket (Item #1) to the top center set of bolt holes. Secure the Mount Arm / Top Brkt,
relatively loose, by using (2) 3/8"-16 x 1" Carriage Bolts (Item #3), (1) 3/8"-16 x 1-1/4" Carriage Bolts (Item #4) and (3)
3/8"-16 Ny-Flange Lock Nuts (Item #5). Refer to Figure A & Figure B below.
Position the Mount Arm / Bottom Bracket (Item #2) to the lower center set of bolt holes. Secure the Mount Arm /
Bottom Brkt, relatively loose, by using (1) 3/8"-16 x 1" Carriage Bolts (Item #3), (1) 3/8"-16 x 1-1/4" Carriage Bolts
(Item #4) and (2) 3/8"-16 Ny-Flange Lock Nuts. Refer to Figure A & Figure B below. Keep the hardware relatively
loose until after the installation of the Mount Arm Gusset on pg 12.
Note: Some parts and part features have been hidden from view for visual clarity.
Figure A
Figure B
Installed Mount Arm Brackets
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

22131541

Table of Contents