Baffle Kit Installation - Peco 22131501 Operator's Manual

Pto-x/engine driven grass collection system toro z-master 4000 series 60" deck
Table of Contents

Advertisement

Deck Baffle Installation
Your unit will need to install a Deck Baffle (Item #1) to prevent any build up of grass clippings or to prevent any
discharge / blowout from the front of your Aluminum Boot.
With your mower deck lifted, position the Deck Baffle (Item #1) under the Deck with the side face of the baffle
relatively flushed to the side of the deck.
Align the bolt holes of the Deck Baffle with the bolt holes on the deck and secure the Deck Baffle using (2) 3/8"-16 x 1"
Carriage Bolts (Item #2.1), (2) 3/8"-16 Ny-Flange Lock Nuts (Item #2.2), (1) 5/16"-18 x 3/4" HHCS (Item #2.3), (1)
5/16" Flat Washer (Item #2.4), and (1) 5/16"-18 Flange Nut (Item #2.5). Refer to Figure A and Figure B.
Note: Some parts and part features have been hidden form view for visual clarity.
Figure A
(2) 3/8"-16 x 1"
Carriage Bolts
(2) 3/8"-16 Ny-Flange
Lock Nuts
Figure B
Deck Baffle / 60" Deck
(1) 5/16"-18 x 3/4" HHCS
(1) 5/16" Flat Washer
(1) 5/16"-18 Flange Nut
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

22131541

Table of Contents