Throttle Kit Installation - Peco 22131501 Operator's Manual

Pto-x/engine driven grass collection system toro z-master 4000 series 60" deck
Table of Contents

Advertisement

Throttle Kit Installation

Engine Driven Unit Instructions
The Throttle Kit is installed on the right side ROPS above of the Right Frame Bracket / Upper, see Figure B.
Place the 3/8"-16 U-Bolt (Item #3) onto the right side ROPS with the threads facing out away from the side of the
mower. Next slide on the Throttle Mount Plate Assembly (Item #1) with the rivets also facing outward away from the
side of the mower. Secure the Throttle Mount Plate Assy to the ROPS by using (2) 3/8"-16 Ny-Flange Lock Nuts (Item
#4). Refer to Figure A.
With the Throttle Cable Kit facing back towards the Mower's rear, place the Throttle Base Plate over the rivets, slide
the Throttle Cable Kit to the right, moving the smaller end of the slot over the rivets. When positioned correctly, the
Throttle Spring Plate will snap into place, see Figure A.
To remove the Throttle Cable Kit, lift the Throttle Spring Plate and slide the Throttle Kit to the left.
Note: Some parts and part features have been hidden from view for visual clarity.
Figure A
Figure B
Right Frame
Bracket / Upper
30
Engine Drive
Throttle Cable
Kit Installed

Advertisement

Table of Contents
loading

This manual is also suitable for:

22131541

Table of Contents