Outdoor Unit Installation; Before Installation - Gree U-MATCH Series Service Manual

Dc inverter air conditioners
Hide thumbs Also See for U-MATCH Series:
Table of Contents

Advertisement

√ (Correct) 1/100 or more gradient
1.2.11 Testing of Drain Piping
After piping work is finished, check if drainage flows smoothly. Shown in the Figure 3-1-61, Add
approximately 1liter of water slowly into the drain pan and check drainage flow during COOL running.

2 OUTDOOR UNIT INSTALLATION

2.1 Before Installation

After receiving the machine, please check for any transport damage. If finding any surface or
internal damage, please immediately report to the transport company or equipment company in writing.
After receiving the machine, please check the unit and accessories in reference to the packing list.
Ensure that the model is correct and the machine is in good condition. Please also check if the
specification and quantity of accessory parts are correct.
Determine the correct handling route and methods, thus to avoid damaging the unit or causing
possible hazard. For the sake of protection and safety, it is suggested to move the unit with the
packaging box. Even though it is not permitted to do like this under special occasions, do not remove the
packaging box, thus to avoid loosening or falling during handling.
Confirm if the installing foundation is solid. When this unit is to be installed on the metal section of
the building, make sure that the electrical insulation must comply with applicable standards.
1~1.5m(3-2/7~5feet)
Figure 3-1-59
Figure 3-1-60
67
U-Match Series DC Inverter Service Manual
× (wrong )

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents