Huawei AP7052DN Hardware Installation And Maintenance Manual page 72

Table of Contents

Advertisement

AP7052DN&AP7152DN
Hardware Installation and Maintenance Guide
Figure 5-52 Routing the core wires through the load bar
Table 5-7 Mapping between core wires and pins
Pin ID
1
2
3
4
5
6
7
8
Step 4 After routing core wires through the load bar, move the load bar to the bottom to connect to
the cable support rack, and neatly cut the edge cables, as shown in Figure 5-53.
Issue 01 (2017-12-29)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Core Wire Color
White-orange
Orange
White-green
Blue
White-blue
Green
White-brown
Brown
5 Appendix