Completing the Installation
RJ45
Pin
4
1
6
5
2
RJ45
Pin
1
2
4
5
6
8
Completing the Installation
Completing the DFE module installation depends on if the module is being installed in:
•
a new DFE module system (refer to "Completing the Installation of a New System" on
page 3‐25), or
•
an established, operating DFE module system (refer to "Completing the Installation of a DFE
Module in an Existing System" on page 3‐26).
3-24 Installation
VT Series Port Adapter Wiring and Signal Diagram
DB25
Conductor
Pin
Red
2
Blue
3
Yellow
5
Green
7
Orange
20
Modem Port Adapter Wiring and Signal Diagram
DB25
Conductor
Pin
Blue
2
Orange
8
Red
3
Green
7
Yellow
20
Gray
22
Signal
Transmit (TX)
Receive (RX)
Clear to Send (CTS)
Ground (GRD)
Data Terminal Ready
Signal
Transmit (TX)
Data Carrier Detect (DCD)
Receive
Ground (GRD)
Data Terminal Ready (DTR)
Ring Indicator
Need help?
Do you have a question about the Matrix 7GR4202-30 and is the answer not in the manual?
Questions and answers